sbloggugl.blogg.se

Max 7 gswitch more inlets
Max 7 gswitch more inlets






max 7 gswitch more inlets

Any representations related to energy or water consumption of residential or commercial clothes washers must be made in accordance with the appropriate appendix that applies ( i.e., Appendix J or this appendix) when determining compliance with the relevant standard. Manufacturers must use the results of testing under Appendix J to determine compliance with any amended standards for clothes washers provided in 10 CFR 430.32(g) and in § 431.156 that are published after January 1, 2022.

max 7 gswitch more inlets

Any representations made on or after Novembut before the compliance date of any amended standards for clothes washers must be made based upon results generated using this appendix as codified on July 1, 2022. Specifically, before Novemrepresentations must be based upon results generated either under this appendix as codified on Jor under this appendix as it appeared in the 10 CFR parts 200- 499 edition revised as of January 1, 2022. Individual loops were operated continuously for more than one year.Manufacturers must use the results of testing under this appendix to determine compliance with the relevant standards for clothes washers from § 430.32(g)(4) and from § 431.156(b) as they appeared in Januedition of 10 CFR parts 200- 499.

max 7 gswitch more inlets

Twenty-five test loops were operated for an accumulated operating time of 290,00 hr. Concent 85% F, and a salt flow rate of up to 3 gpm. Concent 85% F, a maximum wall temperature in the range 1200 to 1500 un. Most test loops were fabricated of 0.5-in.-OD, more » 0.045-in.-wall tubing, and operate with a temperature differential of up to 200 un. Concent 85% F) in the event of a loss of power. Automatic controls and equipment were developed to prevent solidification of the salt mixtures (mp, 800 to 1100 un. The test loop consists of a pump, two heated sections, a cooled section, a drain tank, and a frozen-plug-type valve. The standard loop accommodates various combinations of materials, fluid, flow, rates, and temperature differentials and permits fabrication of components in sufficient quantity for cost reduction.

max 7 gswitch more inlets

Standardized test facilities were developed and operate for investigating the compatibility of structural materials and flowing molten fluoride salts. Receipt Date: 30-JUN-73 Country of Publication: United States Language: English Subject: N50210* -Metals, Ceramics, & Other Materials-Metals & Alloys-Corrosion & Erosion & Surface Phenomena CORROSION DESIGN FLUOROBORATES HASTELLOY N SODIUM COMPOUNDS SODIUM FLUORIDES TESTING CORROSION LOOPS/design and operation of forced- circulation, for studying corrosive effects of sodium fluoroborate salts on Hastelloy N SODIUM FLUORIDES/NaBF$sub 4$-base-NaF, corrosive effects on Hastelloy N, design and operation of forced-circulation loop for testing SODIUM FLUOROBORATES/NaBF$sub 4$-base-NaF, corrosive effects on Hastelloy N, design and operation of forced-circulation loop for testing HASTELLOY N/corrosion by sodium fluoride-sodium fluoroborate eutectic salts, design and operation of forced- circulation loop for testing OSTI Identifier: 4600150 Report Number(s): ORNL-TM-3863 NSA Number: NSA-27-012446 DOE Contract Number: W-7405-ENG-26 Resource Type: Technical Report Resource Relation: Other Information: UNCL. Publication Date: Mon Jan 01 00:00: Research Org.: Oak Ridge National Lab., Tenn.








Max 7 gswitch more inlets